Skip to content

News

Europe’s largest wind turbine to be installed at Østerild test centre

image
10 December 2024

The Danish wind energy sector reached a new milestone with the installation of Siemens Gamesa’s latest prototype wind turbine at the Østerild National Test Centre in Thy, Denmark. Standing over 300 metres tall from base to blade tip, the new turbine boasts an unprecedented power output of 21 MW, making it the largest wind turbine outside of China.

:

Get an introduction to some of the world's biggest wind turbines

Test Centre Østerild is located on the west coast of Northern Jutland. It has some of the best win conditions in the world and allows the manufacturers to test full-sized turbines before they enter the market.

Video credits: Produced by Simon Rubin ([email protected])

Setting new benchmarks

This towering innovation signifies a leap forward in turbine design and capacity. With its 130-metre-long blades attached to a nacelle measuring 11 by 11 metres, the turbine is expected to generate enough power to meet the annual electricity needs of approximately 20,000 households. The turbine’s installation comes at a time when the global wind energy market is fiercely competitive, particularly as European manufacturers face mounting pressure from Chinese counterparts.

Jacob Pedersen, Head of Equity Research at Sydbank, commented: “This turbine is a major step forward, substantially larger than other Western offshore models currently on the market. It strengthens Europe’s position in the global wind energy sector.”

The transportation of the turbine components to Østerild was an engineering challenge in itself. Roads were temporarily reconfigured, with streetlights and signs removed, and roundabouts widened to accommodate the oversized load as it travelled from Siemens Gamesa’s factory in Brande, Jutland to the test centre.

Once operational, the turbine will undergo rigorous testing to refine its performance and ensure it meets international standards for commercial deployment.

A response to global competition

The race to build larger and more efficient turbines is intensifying as countries aim to meet ambitious renewable energy targets. The new Siemens Gamesa turbine comes as a response to similar advancements in China, where manufacturers have introduced turbines with outputs exceeding 25 MW.

Jan Hylleberg, Deputy Director at Green Power Denmark, explained: “Chinese producers benefit from extensive state support, making competition challenging. This new turbine represents Europe’s response, showcasing innovation and scale to maintain competitiveness.”

The development of this turbine has been bolstered by EUR 224 million in EU development funding, highlighting the importance of public-private collaboration in accelerating green energy innovation. Denmark’s parliament recently approved expanding the Østerild test centre to accommodate turbines up to 450 metres tall, underlining the country’s commitment to maintaining innovation and competitiveness within the wind sector.

The test centre for wind turbines, as the one in Østerild, represents an important aspect of Denmark’s wind sector, which encompasses the whole wind value chain.

Denmark is by many considered the birthplace of offshore wind energy. In 1991, Denmark made history as the first country in the world to install a commercial offshore wind park. 11 wind turbines with a combined capacity of 5 MW were installed in the shallow waters off the coast of Vindeby in the southeast of Denmark.

Learn more about Denmark’ wind energy history, ambitions and discover tangible solutions

 

Related content:

Wind europe 2025

Discover Wind Europe 2025

White paper: Wind energy - driving the global market

Explore the white paper

Explore the Danish wind value chain

Discover the wind value chain